How to Plan Dismantling in a Hotel Renovation

How to Plan Dismantling in a Hotel Renovation

How do you protect time and material value in hotel dismantling done in a short off-season window? Step by step.

Hotel renovations usually happen off-season, in a limited time. A delay in dismantling shifts the whole project; good planning protects both the schedule and the value of the material removed.

Site visit and inventory

The first step is to walk through the hotel together and list the material that will come out grade by grade: air conditioning and VRF units, copper pipework, stainless kitchen equipment, aluminium frames, cables and panels.

Quote model

We offer two models: deducting the dismantling cost from the material, or pricing dismantling and material separately. Once the inventory is clear, the numbers show which is better.

Sequence

After electricity and gas lines are safely disconnected, the kitchen and laundry, air conditioning systems, pipework and frames are removed in that order. Working in blocks according to when construction teams arrive shortens the schedule.

Handover

The material is sorted on site and transported, and the area is handed back swept. A weighbridge ticket is issued for tonnage material.

Tags:
hotel dismantlinghotel renovationair conditioner removal

Send photos, get the price, we collect from your address

Send photos of the material and the approximate amount; we will tell you the day's price and plan the pickup day.

Call Now WhatsApp
Top
Değer Geri DönüşümDeğer Geri Dönüşüm

“We know the value of scrap at your door”

Address

7424 Sokak No: 27, Karşıyaka / İzmir